LIST OF PROJECTS DONE BY JTP CONSULTING ENGINNERS
TO OVERSEAS PROJECTS / CLIENTS
PROJECT | LOCATION | CLIENT | PERIOD | DESCRIPTION | BUILT UP AREA IN SQ.M | |
1. | Refinery Building Development: Main building Canteen/ Dining Block Mosque | Mesaieed Qatar | Qatar Design Consortium & Qatar Petroleum | Nov’ 02 to March’ 03 | G + 10 G + 1 G + 1 BS Standards | 15000 25000 400 |
2. | Aljazi Tower | Doha, Qatar | Qatar Design Consortium & Aljazi Real Estates | Oct’ 02 | 2B+ G + 20 BS Standards | 30000 |
3. | ALBA- RODDING SHOP | Bahrain | BECHTEL / L&T | Aug ’03 to Feb ‘04 | SHOP BLDG, G + 1-Steel +RC structure BS Standards 1200MT | 10,000 |
4. | Lafarge Cements | Bangladesh | Lafarge& L&T Romboll | Oct ’03 to Dec‘03 | General Cargo Jetty | |
5. | B+M+G+6 Shop& Apartments at Bin Mahmoud | Qatar | Qatar Design Consortium/MR investments | Feb ‘04 | B+G+6 BS Standards | 7600 |
6. | G+5 Apartments at Mansoura | Qatar | Qatar Design Consortium | Mar ‘04 | G+5 BS Standards | 4000 |
7. | B+G+5 Apartments At Bin Mahmoud For SHK. Khalid Bin Abdul Rahman Althani | Qatar | Qatar Design Consortium | April ‘04 | G+5 BS Standards | 4000 |
8 | PreGrinder Mill building And Cement Transport System | Kuwait | KCC-Kuwait / Ultra Tech Cement Ltd,Mumbai, India | June ‘04 | 1600 MT. AISC , ACI Standards 45m high 36mX36m. Retrofit of conveyor Gallery | |
9. | Lafarge Cements – Nine no. of Transfer Towers | Bangladesh | Lafarge& L&T ECCD | June ‘04 To Nov ‘04 | 500 MT | AISC stds |
10 | COAL MILL BLDG | Kuwait | KCC | 2004 | RETROFIT OF STEEL BLDG | AISC stds |
11 | National Housing corporation-Sri Lanka – 12 Storied building | Colombo | Graffiti Architects Pvt.Ltd, Chennai | G+11 BS Standards | 11,000 | |
12 | Doha south sewage | Doha Qatar | Drainage affairs, Doha,ITT Sanitaire UK +TCC/CCC and QDC ,Qatar | Mar ’05 to June’05 | BS Standards | From Inlet works to Sludge thickener building covering all buildings and structures. |
13 | SEA WATER TREATMENT PLANT | MAESAID IN QATAR | 1000 MW POWER PLANT-QEWC | NOV’07 | BS Standards | ALL CIVIL WORKS |
14 | Benu Cements close circuiting the cement mills | Nigeria | Sabash Engineers Chennai | APRIL’08 | BS Standards | |
15 | PET COKE STORAGE SHED AND 2x 15000 MT STORAGE SILOS 2NOS | KUWAIT | PCIC | JULY 2011-2012 | AMERICAN STANDARDS | ALL CIVIL AND STRUCTURAL WORKS 200X65M shed AND 28M DIA X60M SILOS |
16 | Waste Water Treatment Works | IRAN | AUG-11 | BS 8007/8110 | ALL TANKS AND PROCESS BUILDING | |
17 | Cement Plant for FCKS | Angola | ETA STAR International | 2013 | American | Silo checking, PH building roof checking ,Non Plant buildings |
18 | Maintenance Shed cum workshop building | Kuwait | PCIC | 2013 | American | Total consultancy |
19 | FACILITIES BUILDING | OMAN | GEC | 2014 | BRITISH | Five BUILDINGS Steel+RCC |
20 | BUILDINGS FOR CLINKER GRINDING UNIT | KUWAIT | FLSMIDTH, Chennai | 2015 | BRITISH | DUMP HOPPERS, TUNNELS, TTs, Conv..GALLER IES,PACKING AND LOADING PLANT ,hopper building. SUBSTATIONS |
21 | Sea water Intake Structures | UAE | WORLEY Parsn ,Chennai | British |
INDIAN PROJECTS / CLIENTS :- ( Several Local commercial works not Listed )
PROJECT | LOCATION | CLIENT | ARCHITECT/ CONSULTANT | NO.OF FLOORS And Descrip-tion | BUILT UPAREA in Sq.ft | |
1 2 3 | Wagon Tippler Building KILPAUK-WTP- CENTRIFUGE HOUSE Tiruppur Water Supply Project | Jharsugu da CHENNAI Tiruppur- Tamilnadu | L&T ECCG. For L&T Cements JCW plant L&T ECCG. L&T ECCG. | ANNA UNIVERSITY GKW Consult GKW consult | Three nos Ground level reservoirs & pump houses 2 ML to 6.5 ML capacity | |
4 | 3 nos 132/33 kv Switch yards | TISCO-Jamshedpur | L&T ECCG. | MN Dastur & company | Several Gantry+ tower structure equipment supports with sub structures. | |
5 | Apartments at West KK Nagar | Chennai | Mr.Ashokan | – | Five Storied RC building | 20,000 |
6 | Tensile Roof -EBEN IT park Mauritius | MIT.LTD | L&T ECCG | TCE & DALAL | ||
7 | Switch yard Structures for APTRANSCO | Andhra-Pradesh | L&T ECCD | |||
8 | RC Water Tank tower & UG Sump | Calicut Airport Authority | L&T ECCD | IIT Madras | ||
9 | NEW TERMINAL BUILDING | Calicut Airport Authority | L&T ECCD | IIT Madras | ||
10 | GUEST HOUSES | UTCL | G+1 | |||
11 | CONTROL BUILDING(SUBSTATION,400 MW) | KONASEEMA | L&T ECCD ,EIL Delhi | NTPC,DELHI | G+2 | |
12 | Fly Ash Bucket elevator Building | Hirmi Cement works | Ultra Tech Cement Ltd,Mumbai, India | – | 75MT | |
13 | Kiln Maintence support towers-Portable | At Four cement plants | Ultra Tech Cement Ltd,Mumbai, India | – | 30MT | For tyre replacement |
14 | GARMENT FACTORY | Maduravoil, Chennai | Graffiti Architects Pvt.Ltd | Three Storied 50’ Span RC | 45,000 | |
15 | Raw Meal Belt Bucket elevator Structure | Hirmi Cement works | Ultra Tech Cement Ltd,Mumbai, India | – | 100MT 100m high | |
16 | Earth Quake Resistant Apartments | Virugambakm -Chennai | M/S Ravi chandran &Co | G+1 Five Types Stils +3 –Two blocks | 40,000 | |
17 | 2Nos Apartments | 7th and 12th Avenues Ashok Nagar, Chennai | M/S Ashok Foundations | G+3 | 20,000 | |
19 | 5000 MT clinker storage and unloading bunkers and Wagon Loading Bldg | Hirmi Cement works | Ultra Tech Cement Ltd. | Steel hoppers ,RCC walls & RC Framed building. | completed | |
20 | Close Circuting of Mill 1,2,3 Awarpur | Awarpur Cement Works | Ultra Tech Cement Ltd. | RC Framed structure supporting Sepax separators and Retrofitting Structures | completed | |
21 | Coal Handling System | Hirmi Cement Works | Ultra Tech Cement Ltd. | Conveyor Galleries, Trestles, Crusher house etc. | completed | |
22 | Wagon loading Building | Jharsuguda Cement Works | Ultra Tech Cement Ltd. | 350m long Shed and precast platform | completed | |
23 | Retrofitting ESP supporting structures | Awarpur Cement Works | Ultra Tech Cement Ltd | completed | ||
24 | Installing two number Beumer Clinker carrying DPCs | Awarpur Cement Works | Ultra Tech Cement Ltd. | Gallery with free end drive platform and pendulam supports | ||
25 | 40m Span GYPSUM STORAGE SHED | WBCW | Ultra Tech Cement Ltd. | Steel truss roof shed | completed | |
26 | IT PARK | HYDERABAD | DKK HOSPITALITY | 1.1LAC SQ.FT | completed | |
27 | IT PARK | OMR, CHENNAI | AEB ENGINEERS | 30,000 SQ.FT | completed | |
28 | 9 MW Biomass Power Plant -Complete | INDIA-NAGPUR | Shriram EPC -CHENNAI | All buildings | completed | |
29 | 12 MW Biomass Power plant-Complete | Chattisgarh-INDIA | Shriram EPC -CHENNAI | All buildings | completed | |
30 | 9 MW Biomass Power plant -Complete | Tamilnadu-INDIA | Shriram EPC -CHENNAI | All buildings | completed | |
31 | PREHEATER BUILDING-ADDITION OF 5TH CYCLONE | INDIA CEMENTS- Shankar Nagar, TamilNadu | ICL-Chennai | existing PREHEATER building for the additional loads | completed | |
32 | 2000Mt-Cement silo+ related compressor bldg & SUBSTATION bldg | Narmada cements- | Completed | |||
33 | Clinker Silo- 15,000 Mt Cement Silo- 6000 Mt Flyash Steel silo-1000 Mt & VRPM building | Madras Cements Salem Grinding unit | Stephen & Associates | Completed | ||
34 | CEMENT TRANSPORT SYSTEM. 100M high New steel TOWER and 50m steel tower modification | ULTRA TECH GUJARAT | – | Completed | ||
35 | 2000TPD CEMENT PLANT( with 4000tpd future provisions) | CKORAMANDAL CEMENTS, NALGONDA AP. | ALL major BUILDINGS | SABASH ENGINEERS PVT. LTD | Completed | |
36 | L&T SHIPYARD | Kattupalli, CHENNAI | All land side port Buildings And major shop building 40m high framed building with 200tons crane. | L&T Infra and L&T Romboll | ONE LAC SQM | Done |
37 | 1200 TPD cement PLANT. | Dandapani (Mauruthi) Cements,Trichy | ALL BUILDINGS AND STRUCTURE | Sabash Engineers, Chennai | DESIGN Completed | |
38 | CM Separator building and LS crusher building | Bagolgot Cements and Industries LTD | Sabash Engineers, Chennai | Done | ||
39 | Coal Mill Dynamic Separator Installation works & Raw Coal Storage Shed 70x120m | Awarpur Ultra Tech | Done | |||
40 | New Clinker line – abt 400m long with a Transfer tower supporting bins and BEs | Gujarat Cement works | Completed | |||
41 | Cement Transport line to Jetty- Modification to suit site | Gujarat Cement works | Completed | |||
42 | Raw mill Roller removing EOT Supports , DPC modification, 100t Bin structure, New Guest House | Narmada Cements | Design completed | |||
43 | New Packing Plant ,Truck loading & Cement Bulk Loading bldg | Jharsuguda Ultra Tech | Completed | |||
44 | Wagon Loading Bldg | Jharsuguda Ultra Tech | 750m, 2000tons. 22 loading conveyors | Completed | ||
45 | Marriage hall and Three star Hotel building at Sirkali | TERN | LArge span four storey RCC bldg | 60000 sq ft | ||
46 | Lime Stone and Coal Storage Shed Structures Proof checking | UltraTech ,Rawan, CHATTISGARG | 90m and 55m single span 200m Long buildings | Completed | ||
47 | COAL HANDLING PLANT for COAL INDIA MCL-Anantha CHP | SHIVANI-Oil Exploration services | Two Silos 5000t capacity, Semi ground Bunker 15000MT capacity 12m/10m wide 4000TPH conveyor Galleries | Completed | ||
48 | Packing Plant and truck loading Terminal at Nagerkoil – Tamilnadu | Chettinad Cements | Steel building Housing 1000Tx2 Silo and ,Packer | Completed | ||
49 | TRUCK LOADING BUILDING AND HOPPER BUILDING | UTCL- PATNA GRINDING UNIT | Hopper STEEL BUILDING 500MT | Completed | ||
50 | Alternate Fuel Systems | UTCL-Gujarat | STEEL BUILDINGS, Conveyor Gallery | Completed | ||
51 | RSPL -COAL HANDLING | GUJARATH | FLSMIDTH | 2500 MT | Completed | |
52 | Ultra Tech-Awarpur | FLSMIDTH | Preheater Building (Only RC Floors and Platforms) | DONE | ||
53 | CEMENT PLANTS IN NEPAL | FLSMIDTH | ALL PLANT BUILDINGS | DONE | ||
54 | PREMIER CEMENT PLANTS IN BANGLADESH | FLSMIDTH | CEMENT MILL AND MILL HOPPER BUILDING AND TRANSPORT TO SILO | DONE | ||
55 | NCTPP-TANGENCO POWER PROJECT | CHENNAI | BGR ENERGY | 14-TRANSFER TOWERS WITH CIVIL SUBSTRUCTURE, 6 RCC BUILDINGS LIKE SUBSTATIONS, COMPRESSOR HOUSE,ELECTRO CHOLRINATION,CHEMICAL HOUSE,OIL UNLOADING PUMP ROOM ETC.,PIPE RACKS | DONE | |
56 | Chettinadu-Port | Mangalore Terminal | ESSAE | 1600MT Cap rectangular STEEL Surge BIN, and 130 tons Weigh Bin-One of Its Kind Building | Done | |
57 | JSW-TORNAKAL | KARNATAKA | ) | 6X1400MT STEEL BINS AND BUILDING, CROSS COUNTRY PIPE CONVEYOR DESIGN CHECKING | DONE | |
58 | 17 KMs CROSS COUNTRY PIPE CONVEYOR AND RELATED STRUCTURES | MAHAGENCO-NAGPUR | ISJEC(IJT-THOMPSON) | DCPL | 5500MT STEEL 25000CUM RCC. ALL STRUCTURES | ONGOING |
Completed 3 Nos 5 MLD STPs for TWAD board, TamilNadu, 50MLD STP for L&T ,37 MLD WTP in MIZORAM, 138 MLD STP for TATA PROJECTS UJJAIN , Filter Building for TWAD, RSGF Filter bldg. for 500MW Power Plants of NTPC(BGR), etc.
SEVERAL MINOR STRUCTRURAL WORKS/RETROFITS NOT LISTED.